Skip to main content
1 min readKnowledge Resource

Knowledge Resource · Open access

Research Summary: Beyond PUE: A Local Impact Audit Framework for Data Center Environmental Accountability

Original authors
Attribution requires verification
Original source
arXiv — Computers and Society
Summary & Analysis prepared by
Aziz Shuaib Ausi
Resource type
Research Summary / Knowledge Resource
Resource published on AZIZ OS
26 September 2026
Reading time
1 min
Publication type
Knowledge Resource
Availability
Open access
About this Summary & Analysis

AZIZ OS provides independently prepared summaries and analytical interpretations of externally published research and knowledge sources. The underlying works remain attributable to their original authors and rights holders. This resource is intended to improve accessibility and understanding and does not replace the original publication.

Checking access…

Current data center sustainability metrics, such as Power Usage Effectiveness (PUE), Water Usage Effectiveness (WUE), and Carbon Usage Effectiveness (CUE), are limited as they do not adequately capture local environmental and societal impacts. This deficiency has led to significant project delays and cancellations, totaling approximately $130 billion in the first quarter of 2026 in the United States alone, primarily due to local opposition concerning water use, power demand, infrastructure capacity, and transparency.

Why it matters

The inadequacy of current sustainability metrics for data centers poses a substantial risk to project viability and financial investment. Addressing local environmental and social impacts is critical for sustainable growth, maintaining public trust, and mitigating significant financial and operational disruptions across the sector.

Key insights

  • Standard data center sustainability metrics (PUE, WUE, CUE) measure internal resource use and emissions intensity, normalized to IT energy use.
  • These metrics do not directly represent local resource scarcity, infrastructure capacity, or social footprint.
  • The gap in addressing local impacts has become politically significant, leading to project delays and cancellations.
  • Local opposition, driven by concerns over water use, power demand, infrastructure capacity, and transparency, caused approximately $130 billion in project delays/cancellations in Q1 2026 in the U.S. alone.
  • The value of delayed/canceled projects in Q1 2026 matches the total for the entirety of 2025.

Source

arXiv — Computers and Society — https://arxiv.org/abs/2609.23421

Citation

Cite the original work (APA 7)

The original source is authoritative for this citation. Cite the source publication directly — this attribution is pending verification. Open the original source.

Verification

This is an authenticated AZIZ OS resource record.

Verification ID
ASA-EXE-2026-00860
Version
v1.0 · r0
Issued
26 September 2026
Resource prepared by
Aziz Shuaib Ausi
Resource status
Research Summary / Knowledge Resource
Underlying work
Beyond PUE: A Local Impact Audit Framework for Data Center Environmental Accountability
Original authors
Attribution requires verification
Original source
arXiv — Computers and Society
Provenance status
Attribution requires verification
Rights
Underlying publication rights remain with the respective copyright holder(s). Refer to the original source for authoritative publication and licensing information.

This verification confirms the AZIZ OS resource record and its documented provenance. It does not establish authorship of the underlying external work.

Verify this resource